000Warming up the
engine…
Move your cursor
to light the workshop
Now booking spring 2027 builds · 3 slots left

Built,notbought.

One-off café racers, scramblers and brat-style bikes, hand-built from a railway arch in Manchester. One rider, one bike, no kits and no catalogues.

047Builds out
14Weeks avg
02Pairs of hands
Start your build →
// 01 · Why we do itEst. 2014

We don't do kits. We don't do catalogues. Every bike that rolls out of the arch is drawn around one rider, built by two pairs of hands, and signed off with a hundred-mile shakedown over the Snake Pass. In the rain, usually.

0Bikes built & out riding
0Hours on the average build
0Fabricated in-house
0Months on the waiting list
// 02 · Recent builds

The garage

01 / 06
DRAG
// 03 · How a build happens

From brew
to burn-up.

Most builds take twelve to sixteen weeks. You'll get photos every Friday, a standing invitation to the arch, and a bike that fits you like your favourite boots.

01

The brew

A coffee and a proper chat at the arch. How you ride, where you ride, what you love and what drives you mad.

1–2 hours
02

The drawing

Full-size side profile sketches, a parts list and a fixed quote. Nothing gets cut until you've signed off every line.

2 weeks
03

The build

Strip, fabricate, rebuild. Frame work, hand-shaped aluminium, wiring from scratch and paint from a small shop in Stockport.

10–14 weeks
04

The shakedown

A hundred miles of real roads, a final fettle, then we hand you the keys and a very thick build book.

1 week
Illuminated service sign above the workshop
// Rider's word
“They built the bike I'd been drawing in the margins of notebooks since I was fifteen. It's better than the drawing.”Jamie R. · Build Nº 041 “Night Mail”
// 04 · Enquire

Let's build
yours.

Where do we start?

Every build begins with a donor bike. Bring your own, or we'll hunt one down.

What's the look?

Pick the one that makes you grin. We'll take it from there.

Ballpark budget

Including donor, parts, labour and paint. No judgement, it just helps us plan.

£18,000
£8k£16k£24k£32k£40k+

Who are we building for?

We'll ring you within two working days to book in a brew.

// Enquiry logged
Cheers,
rider.

Your job card is on the board. We'll be in touch within two working days to put the kettle on.